🔑 Key Provisions:
- Institutionalization of LPTRP:
- Formal adoption of the DOTr-approved Local Public Transport Route Plan (LPTRP) for Naga City.
- Ensures route exclusivity and franchise alignment with LTFRB standards.
- Enforcement & Oversight:
- PSO and TEU authorized to monitor compliance and coordinate with LTFRB.
- Only CPCs consistent with LPTRP routes will be endorsed.
- Transitory Measures:
- Existing operators granted transition support.
- Dry runs and traffic experiments may be extended or institutionalized.
- Legal Anchors:
- RA 7160 (LGU powers), DOTr Order 2017-011 (Omnibus Franchising Guidelines), LTFRB-DOTr Resolution No. 204 s.2025.
- Proposed